Training facility Vitesse

  • Training facility Vitesse 1
  • Training facility Vitesse 2
  • Training facility Vitesse 3
  • Training facility Vitesse 4
  • Training facility Vitesse 5
  • Training facility Vitesse 6
  • Training facility Vitesse 7
  • Training facility Vitesse 8
  • Training facility Vitesse 9
  • Training facility Vitesse 10
  • Training facility Vitesse 11
  • Training facility Vitesse 1
  • Training facility Vitesse 2
  • Training facility Vitesse 3
  • Training facility Vitesse 4
  • Training facility Vitesse 5
  • Training facility Vitesse 6
  • Training facility Vitesse 7
  • Training facility Vitesse 8
  • Training facility Vitesse 9
  • Training facility Vitesse 10
  • Training facility Vitesse 11
  • 关于此项目
  • 使用的产品
  • 相关项目

Sustainability has been the leading theme in the construction of the new training facility of football club Vitesse in the Dutch Arnhem. The building designed by Geesink Weusten Architects, reflects this theme by referring to the natural environment. The new complex was inaugurated in 2013.

Green finish

For a lavishing green finish of the tribune Sempergreen has supplied 500 m2 of plant mats planted with 'Waldsteinia ternata'. The slopes around the training site feature Sedum-mix blankets as ground cover, covering a surface of 420 m2.